Blog

Polycore Tubing Project in Bahrain

Polycore Tubing Project in Bahrain.

Details:

Bahrain is the first place to find oil fields in the Middle East.

At present, most oil Wells use pumping units to extract crude oil, with the output around 100-500bPD.

The well was shallow, at about 2,000 ft (610 m), and the temperature ranged from 120 to 150℉ (48 to […]

Feel Free to Share

OCTG Tubing and Casing Project in Ecuador

OCTG Tubing and Casing Project in Ecuador

Details:

Ecuador has discovered 7.2 billion barrels of crude oil reserves, accounting for 0.6% of the world’s proven crude oil reserves. The oil industry is Ecuador’s largest economic pillar.

SanJack Ecuador was established in August 2018. Its main customers are well-known local oil companies, such as ANDES and […]

Feel Free to Share

Thermal instrumentation laboratory

Thermal instrumentation lab has intelligent digital pressure calibration system and thermal instrument calibration system. This lab was granted many certificates including Temperature instrument calibration device for thermocouple and thermal resistance, thermocouple standard device, calibration devices for thermometer and pressure meter and so on to ensure the accuracy of instruments and make sure that the […]

Feel Free to Share